Born to serve Middle Tennessee

Dumpster Rental Murfreesboro, TN

Dumpster rental in Murfreesboro, TN starts with the right container for your cleanup. Choose a 10, 15, 20 or 30 yard dumpster from Trash Pandy. Standard rentals start at $200 for one day, with disposal billed separately at $140 per ton and no included tonnage.

5.0 rated on Google
Veteran owned US Air Force veteran
What it costs

Murfreesboro Dumpster Prices

All four standard sizes share the same starting price. Your final total depends on disposal weight, extra days and any item-specific charges. Mattresses and box springs are $50 each. Confirm your materials and rental dates before booking.

A 10 yard Trash Pandy container on a residential driveway $200
★★★★★

10 Yard

The starter box. Garage clearouts, single room strip outs and small yard jobs.

Holds about 4 pickup truck loads of waste
  • Pay only for the weight you use
  • 1 day, extra days on request
  • Fits most driveways
Book Online Full 10 yard detail
A 15 yard Trash Pandy container ready for loading $200
★★★★★

15 Yard

The middle option. Kitchen and bathroom remodels, flooring tear outs.

Holds about 6 pickup truck loads of waste
  • Pay only for the weight you use
  • 1 day, extra days on request
  • Room for cabinets whole
Book Online Full 15 yard detail
A 20 yard Trash Pandy container, the most booked size $200Most booked
★★★★★

20 Yard

The one most people end up with. Whole house clearouts, roof tear offs, renovations.

Holds about 8 pickup truck loads of waste
  • Pay only for the weight you use
  • 1 day, extra days on request
  • Fits most driveways
Book Online Full 20 yard detail
Black Trash Pandy 30 yard dumpster $200
★★★★★

30 Yard Dumpster Rental

Large home cleanouts, bulky furniture, and major renovation debris.

Holds about 12 pickup truck loads of waste
  • Pay only for the weight you use
  • 1 day, extra days on request
  • More room for bulky cleanups
Book Online Full 30 Yard Dumpster details
Container sizes, base price, days and tonnage
Size Base price Days included Tonnage included Typical job
10 yard $200 1 no tonnage included and none wasted Single room clearout, small bathroom strip out. Roughly about 4 pickup truck loads, based on a standard 2.5 cubic yard bed.
15 yard $200 1 no tonnage included and none wasted Kitchen remodel, garage and attic together. Roughly about 6 pickup truck loads, based on a standard 2.5 cubic yard bed.
20 yard $200 1 no tonnage included and none wasted Whole house clearout, roof tear off, full renovation. Roughly about 8 pickup truck loads, based on a standard 2.5 cubic yard bed.
30 Yard $200 1 No included tonnage Large cleanouts and renovation debris

Concrete and fill use a dedicated 10-yard service, with capacity for up to 10 yards. See concrete and fill details and call to confirm your load and pricing.

What changes the final total
Variable Rate When it applies
Weight $140 per ton On the 10, 15, 20 and 30 yard, every ton is billed at this rate. The load is weighed on a certified scale and the ticket goes on your invoice.
Extra days Quoted when you ask Past the days included above. Ring before the collection date rather than after it.
Restricted items Tires $15, wet paint $10 per gallon, large electronics and televisions $30 These go in the container but carry a disposal fee. Full list on what can go in a dumpster.
Wasted trip Quoted before we dispatch If the truck arrives and cannot place or collect the container, for example a car in the way or a locked gate.

Need help loading? A two-person crew is available with your rental for $120 per hour. Request full service junk removal and loading help; rental and disposal charges are separate.

Worth knowing

Plan Your Murfreesboro Cleanup With Trash Pandy

Discuss the debris, access and schedule with Trash Pandy before delivery. Choose your container for the material and space you need, then confirm the costs for your particular load.

You pay for what you throw away

Weight is billed per ton rather than bundled, so a light load costs less. Nobody subsidises anybody else’s remodel.

Schedule changes, same day

A slipped date or an extra day is settled in one call, not a support ticket. On an active site that is the difference between a crew working and a crew standing around.

Every rate is published

The per ton figure, the fees and the days included are all on this page. Nothing is quoted only after you have committed.

How it runs

Booked In Two Minutes, Gone When You Are Done

Four steps, and only the first one needs any thought.

  1. Pick a size

    Tell us what you are removing and how much space is available for delivery. Compare the 10, 15, 20 and 30 yard dumpsters before you choose.

  2. Book and pay online

    Two minutes, any hour of the day. The 10-yard fill is the exception and goes through the phone, since fill loads get checked before dispatch.

  3. We place it

    Usually on the driveway, which avoids the street placement question entirely. Drivers use boards to protect the surface and will talk placement through rather than guess.

  4. Fill it, we collect

    Book the collection whenever the job wraps up. Every load crosses a certified scale and the ticket lands on your invoice, so the weight charge is auditable rather than asserted.

Weight, not volume

What These Jobs Actually Weigh

Volume fills a container, weight is what you pay for, and the two are not the same. Dense material hits the weight long before it fills the space, which is why the honest answer to “what size” starts with what you are throwing away rather than how big the pile looks.

Garage and attic clearout

10 yard

usually well under a ton

Bulky, light and awkward. Furniture, boxes and old sports gear fill the volume long before they trouble the scale. Our own average 10 yard load runs 0.73 tons, which is exactly the job per ton pricing suits.

Kitchen or bathroom remodel

15 yard

2 to 3 tons, and more once tile or plaster is involved

Heavier than people expect. Ceramic tile alone runs 4 to 5 lb per square foot before you count the mortar bed and backer board, and older plaster is about 11 lb per square foot, two to three times modern drywall. A container half full of tile can already be at weight.

Roof tear off

20 yard

2 to 4 tons for a single layer on a typical 2,000 sq ft roof

The heaviest common job by a distance. Three tab shingles are 230 to 250 lb per square and architectural are 375 to 430 lb, so a 2,000 sq ft roof is 20 squares x 250 lb = 5,000 lb, about 2.5 tons, or 20 squares x 430 lb = 8,600 lb, about 4.3 tons in architectural. 5 to 8 tons once there are two layers.

Check the eaves before you book. Two layers means double the weight, and on a bigger roof that is more than one haul whatever container it starts in. Knowing that beforehand is the difference between planning a second collection and having a driver refuse the load on the day. These are industry figures from published material weights rather than our own scale tickets, so treat them as planning numbers and call if your job sits near a boundary.

On the ground

Our Containers On Real Jobs

Every photograph is one of our own containers on a customer site. Useful if you are trying to picture how much driveway one of these actually takes up before you book.

A teal 20 yard container sitting on a driveway beside a house and detached garage
Driveway drop offSet down beside the garage with the drive still usable
A container filling with stripped shingles while roofers work on the roof behind it
Roof tear offShingles hit the weight before they fill the space
A container on a new build street lined with timber framed houses under construction
New build siteMixed construction debris on an active street
A container loaded with cardboard and household debris on the lawn beside a brick house
Household clearoutLoaded from the yard, no street placement needed
William Shackelford at the wheel of the Trash Pandy pickup with a container loaded behind
William ShackelfordThe owner, out on a delivery run
By job type

Murfreesboro Jobs We Run Most

Each has its own page with the sizes and weights for that work. Planning a project? Read our Murfreesboro landscaping dumpster guide or garage renovation planning guide before booking.

One thing worth knowing before you plan a haul of your own: the Rutherford County Landfill on Landfill Road here in Murfreesboro stopped accepting construction and demolition material in 2018, and now takes brush and off-the-rim tires only. Turning up with a trailer of remodel debris is a wasted afternoon.

Placement matters more on some sides of town than others. Blackman, on the northwest side, is where most of the newer subdivision building has gone, and on a newer lot the driveway is usually the only placement that works. That is not a problem: a container on your own driveway sits outside the public right of way, which is the thing permits govern.

Ready when you are

Get A Container On Site

Two minutes online and it is booked. If the access is tight or you are torn between two sizes, ring first and talk it through.

The area

Murfreesboro And The Towns Around It

Nearby towns

Same trucks, same rates across all of them. Sitting on a boundary makes no difference to what you are quoted or who turns up.

Murfreesboro sits in Rutherford County, and the full footprint of our Middle Tennessee dumpster rental is on the service areas page.

Straight answers

Murfreesboro Questions, Answered

Tap any question to open it. The first one is open already so you can see how it works.

Do I need a permit for a dumpster in Murfreesboro?

No permit is needed when the container sits on your own property, which covers the driveway, lawn or back yard. Permits exist to govern the public right of way, so you only need one if the container goes on the street or the curb. Commercial sites can carry extra requirements.

That is why almost every delivery we make is a driveway placement. Murfreesboro handles street and sidewalk work under Chapter 28, Article III of the city code, administered by Building and Codes at City Hall on West Vine Street. If your only option is the street, tell us when you book and we will confirm what is needed before the truck is scheduled. Background on dumpster permits.

How much does dumpster rental cost in Murfreesboro?

A 10, 15, 20 or 30 yard container costs $200 to deliver, plus $140 per ton for whatever you put in it. A typical 20 yard load runs about $421 once the weight is added. There is no bundled tonnage, so a light load costs less than a heavy one.

Concrete and fill use a dedicated 10-yard service, with capacity for up to 10 yards. See concrete and fill details and call to confirm your load and pricing.

How fast can you deliver a dumpster in Murfreesboro?

Same day delivery is often available in Murfreesboro, though it depends on what is already booked and what is on the truck that morning. Next day is usually straightforward. Call rather than book online if you need it today, because the phone gets you a real answer immediately.

No cutoff time is published because none has been set, and a promised deadline that cannot always be met is worse than an honest maybe. More on same day rental in Murfreesboro.

What size dumpster do I need for a roof in Murfreesboro?

A 20 yard handles most single layer tear offs on a typical home here. Shingles run 230 to 250 lb to 375 to 430 lb per square, so a 2,000 square foot roof lands between 2.5 and 4.3 tons. Two layers usually means a second haul whatever size you start with.

Check the eaves before you book. If you can see two courses of shingles at the edge, plan for double. Detail on roofing dumpster rental.

What if my job runs longer than one day?

The base price covers one day on the 10, 15, 20 and 30 yard. If the job runs longer, call before the collection date and the extra days are quoted then. Extending is cheaper than having the container collected and redelivered, so ring early rather than late.

Where does my debris go after it is collected?

Loads from Murfreesboro stay inside Rutherford County at the construction and demolition facilities here. Nothing goes to Nashville. Every load crosses a certified scale on the way in, and that weight ticket is exactly what your per ton charge is calculated from.

It is also why the weight line on your invoice is checkable rather than something you have to take on trust.